KAIYUE KAIYUEGENERATOR PARTS
Get a Quote
ATS

63A

Generator Automatic Transfer Switch 3 Phase Din Rail Automatic Transfer Switch 63A

63 A three-phase DIN-rail ATS for generator mains changeover.

Model Number63A
Discuss on WhatsApp ↗

Technical Data

Warranty 13 months
Place of Origin Fujian, China
Brand Name KAIYUE
Model Number 63A
Certification CE,ISO9001
ParameterOriginalKAIYUE Replacement
Control typeAMF / MRS / Auto-StartAMF mains-failure and remote start
DC supply12/24 VDC nominal12/24 VDC selectable; confirm battery system
AC sensing0–600 VAC, 1/3 phase0–600 VAC sensing; terminal map supplied
Output ratingRelay outputs, reference-dependentRelay outputs sized for stated contactor/solenoid loads
Magnetic pickup input0.5–35 VAC, 10–10,000 Hz0.5–35 VAC compatible pickup input
Panel cut-out / dimensionsReference drawing requiredProposed drawing confirmed before shipment
Weight / protectionReference unit; IP rating by enclosureApprox. 0.37 kg; front sealing option by project

63A Introduction

This 63 A DIN-rail ATS is for transferring a load between two supplies where the installation supports that switch type.

Poles, neutral and transfer rating
Confirm the pole count, switched neutral and system voltage. Ask for the exact device’s interlock and manufacturer compliance documentation.

Global Market Price Reference (USD)

Basic standalone 4-pole, 63A, 400V automatic-transfer-switch offers ranged from US$36.54 to US$82.12 per unit. Several matched options sat between those endpoints, indicating competitive supply for this specification rather than the much higher budgets associated with enclosed transfer assemblies. Panel buyers should compare utilisation category, interlocking, control-supply requirements, switching sequence and certification before selecting a batch price. Enclosed systems, 2-pole units, different currents and unconfirmed voltage options were excluded.

How do I choose the correct ATS current rating?

Select the rating using the installation design, continuous load, load characteristics, poles, voltage and required short-circuit performance. Motor starting and other transient loads need a model-specific assessment; they should not be treated as a universal current allowance. Send your single-line diagram and load information for review.

View this answer in FAQs ↗
What is the difference between an ATS and a manual changeover switch?

A manual changeover switch requires an operator to move the load from one source to the other. An ATS performs the detection and transfer automatically, which shortens downtime for standby and emergency applications.

View this answer in FAQs ↗
Why does my ATS fail to transfer back to utility power?

Common causes include an unstable utility signal, incorrect voltage-sensing settings, a faulty control board or an interlock that has not reset. Check the control-circuit voltage and the sensing settings before replacing hardware.

View this answer in FAQs ↗
What information should I send to get the right ATS?

Send the rated current, system voltage and frequency, number of poles, control-voltage requirement, enclosure needs and the generator controller model. Photos of the existing unit and its nameplate help the review.

View this answer in FAQs ↗
What transfer time should I expect?

Transfer time depends on the ATS design, the generator start-up sequence and any programmed delay. Confirm the adjustable timer ranges for the specific unit you are considering — confirm the specification with our team.

View this answer in FAQs ↗
Product image enlarged

KAIYUE / REQUEST A QUOTE

20 YEARS EXPERIENCE FOR GENSET PARTS


Email is required so we can reply to your inquiry.

en_US
en_US